Life-Safety Signage Automation

Evacuation signage, engineered from your blueprints.

Clearpathly reads architectural drawings — PDF, CAD, or BIM — computes code-compliant egress routes for every emergency scenario, and delivers print-ready signage with placement maps and a full compliance packet.

41Buildings signed
12,800+Signs delivered
97%First-pass approval
Level 02 — Fire Scenario Route resolved
LAB 01 PLANT STORAGE ATRIUM MECH SERVER EXIT →
Egress graph · 1,204 nodes Solved in 4.2s
Trusted across sectors
Harborview Health Larkspur Living Meridian Court Pier 9 Partners Silverline Logistics
How It Works

From drawing set to installed signage in three steps

No site surveys, no manual takeoffs. Upload the documents you already have and receive a complete, inspector-ready signage package.

1

Upload Your Blueprints

Submit floor plans in any format — DWG, DXF, IFC, PDF, or scanned paper drawings. Our extraction engine identifies walls, doors, stairwells, corridors, and rated exits directly from the geometry.

2

Routes Are Computed

For each emergency scenario, the platform solves primary and secondary egress from every point in the building — enforcing travel-distance limits, dead-end rules, and accessible-route requirements during solving.

3

Signage Is Delivered

You receive print-ready sign artwork, a placement map with mounting heights and orientation for installers, and a compliance packet referencing NFPA 101, IBC, ISO 7010, and ADA provisions.

Scenario Coverage

One building. Every emergency.

A fire moves people out; a lockdown moves them to shelter. Each scenario receives an independent routing pass and a distinct signage set — generated from the same drawings.

🔥

Fire

Shortest-path egress to rated exits, avoiding elevators and corridors beyond code-permitted dead-end limits.

🔒

Lockdown

Inverse routing to securable shelter rooms with sightline-verified sign placement in interior corridors.

⚠️

Seismic

Drop-cover assembly points and post-event egress that avoids glazed atria and unreinforced structural spans.

☣️

Hazmat

Upwind-biased evacuation and isolation zoning for laboratories, plants, and chemical storage occupancies.

Performance & Compliance

Built to the codes your inspectors enforce

Code requirements are constraints inside our routing engine — not a checklist applied afterward. The result shows up in the numbers.

0
Buildings mapped and signed
0
Signs generated to date
0
First-pass inspector approval
0
Median turnaround per floor
NFPA 101 — Life Safety Code IBC — Means of Egress ISO 7010 — Safety Signs ADA — Accessible Egress OSHA 1910.37
Selected Projects

In service across demanding facilities

HealthcareIn service

Harborview Pediatric Annex

Tacoma, Washington

Six-storey hospital wing with non-ambulatory occupancy on every floor. Wheelchair-priority egress with area-of-refuge staging, plus a staff lockdown set.

6Floors
2Scenarios
214Signs
ResidentialIn service

The Larkspur Residences

Seattle, Washington

An 18-storey apartment tower with two below-grade parking levels. Fire and seismic sets with per-floor route variants and photoluminescent stairwell signage.

18Floors
2Scenarios
486Signs
ResidentialIn service

Meridian Court Apartments

Denver, Colorado

A 14-building garden-style complex processed from a single drawing archive, delivering consistent fire egress signage and assembly-point mapping across every building.

14Buildings
2Scenarios
1,120Signs
View All Projects
Clearpathly turned a drawing archive we barely trusted into a signage package our fire marshal approved on the first submission. What used to take a consultant a full quarter took nine days across all fourteen buildings.
RA
R. AlvarezDirector of Facilities, Meridian Court Apartments

See your own building routed

Send us a single floor plan — any format, any age — and we'll return it with computed egress routes and proposed sign placements, typically within two business days.

Request a Demo →